Step 8 - EVM

1 min czytania

Earned value method

Add reports for the earned value method: PV, EV, AC

Calculate the PV value over time based on the baseline and EV and AC based on timesheet reports filled in by resources.

Draw charts for this method.

Put all of this on a separate tab.